• RSS
  • Twitter
  • FaceBook

Exchange Server Forums

Forums | Register | Login | My Profile | Inbox | RSS RSS icon | My Subscription | My Forums | Address Book | Member List | Search | FAQ | Ticket List | Log Out

Move Mailboxes from Single Mailbox Server to new CCR

Users viewing this topic: none

Logged in as: Guest
  Printable Version
All Forums >> [Microsoft Exchange 2007] >> High Availability >> Move Mailboxes from Single Mailbox Server to new CCR Page: [1]
Login
Message << Older Topic   Newer Topic >>
Move Mailboxes from Single Mailbox Server to new CCR - 12.Dec.2011 4:55:02 PM   
baba20009

 

Posts: 5
Joined: 24.Mar.2009
Status: offline
I have two single exchange 2007 SP3 Mailbox Servers (OS = Windows 2003 SP2 Ent) and I am planning to setup CCR cluster with two new servers.
I also have one Hub and One OWA server (exchange 2007 SP3) in Production.
I have followed this link and setup the lab environment.
http://www.msexchange.org/articles_tutorials/exchange-server-2007/high-availability-recovery/deploying-exchange-2007-sp1-ccr-cluster-windows-server-2008-failover-cluster-part1.html
In lab I have one exchange 2007 sp3 with all roles (Labex1). The two CCR servers are exchange 2007 SP3 rollup 5. I had no issue moving mailboxes not having rollup 5 on Labex1.
In production I have prep two new servers with required role and features and I am at the point to configure the Failover Cluster (OS = server 2008 SP1 R2 Ent). I am also planning to install exchange 2007 SP3 Rollup 5 on these two CCR servers and move about 1200 mailboxes.
Although I did not have problems not having rollup 5 on all servers in the lab, could this cause an issue in production? Anything else I missed or need to review?
Thank you
Post #: 1
RE: Move Mailboxes from Single Mailbox Server to new CCR - 13.Dec.2011 1:50:38 AM   
Gulab

 

Posts: 474
Joined: 31.Jul.2008
From: India
Status: offline
I believe you opened the same thread in TechNet forum and Jonas Anderson has answered your question.
Make sure that your active and passive nodes are running the same updates.

_____________________________

Gulab Prasad,
Consultant
MCC 2011 | MCITP: Exchange 2007-2010 | Lync Server 2010 | Server 2008
Blog:www.exchangeranger.com| http://tinyurl.com/d9onet6

(in reply to baba20009)
Post #: 2
RE: Move Mailboxes from Single Mailbox Server to new CCR - 13.Dec.2011 10:34:35 AM   
baba20009

 

Posts: 5
Joined: 24.Mar.2009
Status: offline
Yes I did thank you Gulab.

You May close this thread and I will monitor from TechNet.

(in reply to Gulab)
Post #: 3

Page:   [1] << Older Topic    Newer Topic >>
All Forums >> [Microsoft Exchange 2007] >> High Availability >> Move Mailboxes from Single Mailbox Server to new CCR Page: [1]
Jump to:

New Messages No New Messages
Hot Topic w/ New Messages Hot Topic w/o New Messages
Locked w/ New Messages Locked w/o New Messages
 Post New Thread
 Reply to Message
 Post New Poll
 Submit Vote
 Delete My Own Post
 Delete My Own Thread
 Rate Posts


Follow TechGenix on Twitter