• RSS
  • Twitter
  • FaceBook

Exchange Server Forums

Forums | Register | Login | My Profile | Inbox | RSS RSS icon | My Subscription | My Forums | Address Book | Member List | Search | FAQ | Ticket List | Log Out

Adding 3rd Node to 2 node A/P Exchange 2003 Cluster

Users viewing this topic: none

Logged in as: Guest
  Printable Version
All Forums >> [Microsoft Exchange 2003] >> Installation >> Adding 3rd Node to 2 node A/P Exchange 2003 Cluster Page: [1]
Login
Message << Older Topic   Newer Topic >>
Adding 3rd Node to 2 node A/P Exchange 2003 Cluster - 23.Oct.2012 2:58:44 AM   
WrathyImp

 

Posts: 20
Joined: 4.Feb.2002
From: Q8
Status: offline
Hi,
I need to add a 3rd node to my existing 2 node Exchange 2003 cluster set as Active/Passive Cluster.
We have EVS configured on the cluster, and the active/passive node are sharing resources on a disk array (quorum drive, and exchange db drive).

Here my queries are:
Do I need to connect the 3rd Node to the Disk Array?
During a failover, can the resources be moved to the new node (3rd), if its not connected to the disk array?

The purpose of adding a 3rd node is to have a new server on the cluster to host our exchange 2003, as our current cluster node are old hardware.

If you can suggest any other solution, during the crash of our old cluster nodes.

Thanks
Post #: 1

Page:   [1] << Older Topic    Newer Topic >>
All Forums >> [Microsoft Exchange 2003] >> Installation >> Adding 3rd Node to 2 node A/P Exchange 2003 Cluster Page: [1]
Jump to:

New Messages No New Messages
Hot Topic w/ New Messages Hot Topic w/o New Messages
Locked w/ New Messages Locked w/o New Messages
 Post New Thread
 Reply to Message
 Post New Poll
 Submit Vote
 Delete My Own Post
 Delete My Own Thread
 Rate Posts


Follow TechGenix on Twitter